CAPACITY OBLIGATION CALCULATION
SUMMER 2008 - FOR WINTER ASSESSMENT 2007-8 (C-13)
Peak Load Forecast =  127
Operating Reserve Requirements =  29
A Capacity Obligation =  156
Eligible Installed Capacity (EIC) = 148
B Eligible Unforced Capacity (EUC) = 141
C Off-System Purchases for OR's from NBSO = 8.1
D Off-System Sales to NB for Perth Andover Load = 3
E Net Committed Capacity (B+C-D) 146.1
Capacity Surplus (Deficiency) = A - E 9.9
1/18/2008 13:50
g:\NPCC-CMAS\Winter and Summer Assessments (C-13)\NERC 2007-2008 Winter Assessment\Capacity Obligation.xls