| CAPACITY OBLIGATION CALCULATION | |||||
| SUMMER 2008 - FOR WINTER ASSESSMENT 2007-8 (C-13) | |||||
| Peak Load Forecast = | 127 | ||||
| Operating Reserve Requirements = | 29 | ||||
| A | Capacity Obligation = | 156 | |||
| Eligible Installed Capacity (EIC) = | 148 | ||||
| B | Eligible Unforced Capacity (EUC) = | 141 | |||
| C | Off-System Purchases for OR's from NBSO = | 8.1 | |||
| D | Off-System Sales to NB for Perth Andover Load = | 3 | |||
| E | Net Committed Capacity (B+C-D) | 146.1 | |||
| Capacity Surplus (Deficiency) = A - E | 9.9 | ||||
| 1/18/2008 13:50 | |||||
| g:\NPCC-CMAS\Winter and Summer Assessments (C-13)\NERC 2007-2008 Winter Assessment\Capacity Obligation.xls | |||||