| CAPACITY OBLIGATION CALCULATION | |||||
| SUMMER CAPABILITY PERIOD (Apr. 2010- Oct. 2010) | |||||
| Peak Load Forecast = | 115 | ||||
| Operating Reserve Requirements = | 12 | ||||
| A | Capacity Obligation = | 127 | |||
| Eligible Installed Capacity (EIC) = | 208 | ||||
| B | Eligible Unforced Capacity (EUC) = | 158 | |||
| C | Off-System Purchases for OR's = | 12 | |||
| D | Off-System Sales to NB for Perth Andover Load = | 7 | |||
| E | Net Committed Capacity (B+C-D) | 163 | |||
| Capacity Surplus (Deficiency) = A - E | 36 | ||||