CAPACITY OBLIGATION CALCULATION
SUMMER CAPABILITY PERIOD (Apr. 2010- Oct. 2010)
Peak Load Forecast =  115
Operating Reserve Requirements =  12
A Capacity Obligation =  127
Eligible Installed Capacity (EIC) = 208
B Eligible Unforced Capacity (EUC) = 158
C Off-System Purchases for OR's  = 12
D Off-System Sales to NB for Perth Andover Load = 7
E Net Committed Capacity (B+C-D) 163
Capacity Surplus (Deficiency) = A - E 36